VEAS - English - Keyfigures
| The Treatment Plant | ||
|
Main sewer tunnel |
Length |
42.3 km |
|
|
Storage volume at 4 m³/s |
187 000 m³ |
|
|
Storage volume at 7.5 m³/s |
137 000 m³ |
|
Transportation time |
From Majorstua (Oslo) to Slemmestad |
approx. 5 hours |
|
Inlet pumps |
8 in total, whereof 2 variable-speed |
|
|
|
Capacity with 2m level on suction side |
8 x 920 l/s = 7 360 l/s |
|
|
Capacity with 10m level on suction side |
8 x1050 l/s = 8 400 l/s |
|
Screens |
4 with bar spacing of |
3 mm |
|
Aerated grit chamber |
4 with a total volume of |
3 320 m³ |
|
Flocculation |
Takes place in the aerated grit chamber |
|
|
Sedimentation tanks* |
2 at 15.7m x 91.2m x 3.6m deep |
10 300 m³ |
|
Sedimentation tanks** |
6 at 15.7m x 17.7m x 10.5m deep |
17 500 m³ |
|
Nitrification filters** |
24 of 87 m², 4m depth of filter media |
|
|
Denitrification filters** |
24 of 65 m², 3m depth of filter media |
|
|
Sludge thickening |
2 rotary drum thickeners 1 storage thickener of 1 500 m³ |
|
|
Sludge dewatering |
4 combined filter presses and thermal vacuum dryers, 140 chambers, 25 mm recess, plate size |
1.5 m x 1.5 m |
|
Deep sea discharge |
4 diffusers, depth |
40 - 55 m |
|
Distribution depth |
|
25-35 m |
*) In original plant
**) In rebuilt plant